Services

Live Core Drilling for Anaerobic Digesters

Live core drilling is a specialist service that allows anaerobic digestion (AD) operators to safely access and extract samples from live digesters without the need for full drain-down or shutdown. At BioContractors, we deliver engineered, field-proven live core drilling solutions designed specifically for biogas and AD systems.

Used across the UK and Europe, this service helps operators gain accurate, real-time insight into digester performance while maintaining gas containment and operational uptime.

Worker in safety gear cutting a large pipe with industrial equipment outdoors, near a green and pink wall and a large metal tank.

Our Approach

Key features:

  • Pressure-rated, purpose-built equipment for biogas environments

  • Remote extraction of samples to avoid personnel entry

  • Gas-tight operation with no compromise to containment

  • Fully risk-assessed and method-statement-led delivery

  • Rapid deployment across the UK and Europe

Our service is delivered by experienced anaerobic digestion professionals with deep technical knowledge of biogas systems. Every project is tailored to site requirements, ensuring safe delivery and actionable outcomes.

We make sure that our equipment and methodology meet the rigorous safety, environmental, and operational standards required in AD operations.

Biocontractors Anaerobic Digestion Biogas Plant Live Core Drilling

Why choose Live Core Drilling?

Live core drilling in anaerobic digestion offers a superior approach to understanding substrate conditions. Rather than relying solely on assumptions or historical data, this method provides precise, site-specific insights that are critical for making informed operational decisions.

Operators can obtain real-time data on the physical and chemical properties of the materials involved in the digestion process. This technique allows for a thorough examination of the substrate composition, moisture content, and potential contaminants, leading to a comprehensive understanding of how these factors influence biogas production and digestion efficiency.

Benefits of Live Core Drilling

Operational Continuity

Avoids the need for full tank emptying or process interruption, minimising downtime and lost gas yield.

Fast, Accurate Insights

Provides immediate, reliable data to support performance analysis and decision-making.

Improved Maintenance Planning

Enables evidence-based scheduling of maintenance, cleaning, or refurbishment works.

Enhanced Plant Longevity

Regular internal sampling helps identify issues early, reducing the risk of long-term structural or process failures.

What our clients are saying

Stylized logo with three dark teal slanted stripes separated by black space.
Enege logo in blue and black text with a curved blue line above.

“Thank you for reacting so quickly to our last-minute need for some hole drilling, I was very happy with the work the guys delivered, the connections were put to work before your guys even finished clearing the tools away.”

Chris Jenkins | Plant Manager, ENGIE UK

abstract dark blue and black diagonal striped background

Get in touch

Interested in our Live Core Drilling?

To find out more about our services please contact us using the form and one of our expert team will be in touch