Services

24/7 Critical Response

When something goes wrong on your anaerobic digestion site, downtime isn’t an option — that’s where we come in.

Our Critical Response service is designed to get you back up and running as quickly as possible.

Aerial view of a construction site for a water treatment plant with large storage tanks, a tower crane, and surrounding farmland.

Nationwide call-out response within 24 hours

Offering support and resolutions when the worst case scenario hits. We provide a range of soltuons to minimise downtime and get your plant back up and running.

Two workers wearing safety vests and helmets standing outside a large industrial facility with black tanks and metal walkways.

Call us on: 0800 699 0799

What is Critical Response for Anaerobic Digestion Plants?

Critical response is a fast-track emergency support service tailored for AD facilities. When unexpected faults or breakdowns occur, time is critical. Unplanned downtime can lead to energy losses, compliance breaches, and costly interruptions in gas-to-grid operations.

At BioContractors, our Critical Response service is designed specifically for the complexities of AD sites, from mechanical and electrical failures to gas handling and control system faults.

It’s our job to get you operational, safely and swiftly.

Damaged industrial machine with exposed and burnt internal components, including broken metal parts and debris.

Rapid, Expert-led
Fault Resolution

We bring a practical, fault-finding approach backed by years of hands-on experience in the sector. When a fault occurs, our team mobilises immediately, aiming to be on-site within 24 hours or less.

Whether it’s a control system issue, sensor failure, pump breakdown or a grid export problem, we’ll get to the root of it, isolate the fault and implement a fix - fast. Often during the same visit thanks to our broad inventory of critical spare parts.

Our Critical Response teams handle:

  • Electrical faults and control system failures

  • Mechanical issues, including pump or agitator breakdown

  • Sensor calibration errors

  • Gas-to-grid export faults

  • Safety or compliance system failures

Why our clients trust our Critical Response Team

Fast Response: We are on-site within 24 hours, nationwide.

Black outline icon of a lightning bolt.

Decades of experience: A team of experienced engineers who know the AD industry, inside out.

Icon of a lightbulb.

In stock parts: No need to wait on deliveries with our wide range of parts and components.

Icon of a wrench, representing tools or repair.

AD plant, live core drilling

Multi-Disciplinary Team: We have breadth of knowledge in electrical, mechanical & instrumentation expertise.

Icon of two stylized human figures, one larger and one smaller, representing people.

Get in touch

Ready to start your next project?

Whether you need advice, a quote, or a tailored solution. Get in touch with our expert team to learn more.